New Department Home Page
- Permitting, Environment and Regulatory Affairs
Permit Applications
Welcome to the Permit Applications page. If this is your first visit, please read the instructions on the Permits page for instructions. For more information on permit applications, call 305-372-6789 or email derm@miamidade.gov.
- One-Time Permits may be required prior to construction or modification of a building structure or property (i.e. construction of a dock or pier or the removal of a tree).
- Operating Permits may be required from certain businesses or industries to renew periodically. For example, this includes facilities such as a small mechanical repair shop and a sewage treatment plant.
- Other Forms & Affidavits, in most cases, are necessary to comply with state or federal requirements.
- Plan Review documents are needed for the review and completion of construction permits such as Certificates of Use and Occupancy, etc.
Please note that the Permit Applications table below lists the different types of permits; explanations for each permit; the corresponding permit applications; and frequently asked questions (FAQs) for each permit, such as how to process the permit, any associated costs and contact information.
To use this table, first think of the project you are doing -- i.e., I want to build a dock. Then look for that type of activity on the left-hand column under "dock" construction or repair. In the middle column, you will find the permit application that is required for this activity, and in the right-hand column, FAQs associated with this permit application.
Request time extensions for permits
Those requiring a time extension for a Class II, Class III, Class V or Class VI permit need to submit the following application 30 days before the permit expires. For more information, please call 305-372-6681.
Request to transfer active Class II, III, V, and VI permits
A person requiring to transfer a Class II, III, V and VI permit when a property is sold to another person or entity needs to submit an application prior to 120 days after the date of transfer of ownership, or 90 days before the permit expires, whichever comes first. Permits are voided if no transfer is completed within the 120 days of the date of change in ownership or 90 days of permit expiration. Please use the Permit Transfer Form to submit your application. For more information, call 305-372-6681.
One-Time Permits
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Air pollution sources – required prior to the construction or modification of any facility or emissions unit |
Miami-Dade County Air Construction Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Coastal construction projects such as installation or repair of docks, piers, pilings, moorings, marinas, boatlifts, davits, seawalls and seawall caps. A Class I permit is required prior to doing any work in, on, over or upon the tidal waters of Miami-Dade County or any of its incorporated municipalities. |
Class I Permit Application ![]() |
FAQs |
| Construction with on-tidal canals, canal rights-of-way, canal maintenance easements & reservations | Class III Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Dewatering or whenever water is removed from an excavation or depressed ground |
Class V Permit Application ![]() |
FAQs |
| Dock(s) construction, installation or repair (including piers, pilings, moorings, marinas, boatlifts, davits, seawalls and seawall caps). A Class I permit is required prior to doing any work in, on, over or upon the tidal waters of Miami-Dade County or any of its incorporated municipalities. | Class I Permit Application ![]() |
FAQs |
|
Drainage construction in non-residential sites or landfills, remedial waste sites, etc. |
Class VI Permit Application ![]() |
FAQs |
| Drainage construction with outfalls or connection to an existing outfall | Class II Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Mangrove trimming or removal and any project that involves filling or the placement of fill in coastal or mangrove wetlands. A Class I permit is required prior to doing any work in, on, over or upon the tidal waters of Miami-Dade County or any of its incorporated municipalities. |
Class I Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Sewer pipes and pump stations (new construction OR modification of existing) |
Miami-Dade Environmental Resources Management Utility Collection and Transmission Capacity Certification ![]() FDEP Domestic Wastewater Collection and Transmission System Construction ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Trees – cutting down, bulldozing, removal or relocation in Miami-Dade County, except for certain exemptions |
Tree Removal Permit Application ![]() |
FAQs |
| Trees – cutting down, bulldozing, removal or relocation in a Natural Forest Community | NFC Permit Application ![]() |
|
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Wetlands (Freshwater) – a permit is required for direct and indirect impacts to freshwater wetlands including clearing, filling and/or demucking |
Class IV Permit Application ![]() Class IV Permit Application Package ![]() |
FAQs |
Operating Permits
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Air pollution sources – required for the operation of any facility or emissions unit |
Miami-Dade County Air Operating Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Boat docking and storage facilities |
Marine Facilities Operating Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Dry Cleaners (Perchloroethylene) – air permit required for the operation of these facilities |
PERC Dry Cleaner Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Grease waste to the sewer system – flow is less than 25,000 gpd |
Grease Discharge Operating Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Hazardous & biohazardous waste transport – waste oil, septic waste, waste radiator fluid, photographic chemicals & other non-hazardous industrial waste |
Liquid Waste Transporter Permit Application ![]() |
FAQs |
| Hazardous materials or hazardous waste – large user or generator | Industrial Facilities (IW-O) Permit Application ![]() |
FAQs |
|
Hazardous material or hazardous waste – small user or generator, facilities include mechanical repair facilities, machine shops, paint & body shops, chemical storage facilities, X-ray & photo developing facilities, printers & salvage yards |
IW5 Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Industrial Waste Pretreatment (IWP) Facility Permit Application - applicable to construction of new sources, relocation of existing sources and upgrades of existing permitted facilities to the IWP program |
Industrial Pretreatment Facility Permit Application ![]() |
FAQs |
| Industrial Pretreatment Facility (IWP) - modifications to existing IWP permitted facilities | Revision to an Industrial Pretreatment Facility ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Lake fill |
Solid Waste/Lake Fill Permit Application ![]() |
FAQs |
| Land use – non-residential, within major wellfield protection areas not served by sanitary sewers | IW6 Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Ozone-depleting compounds (ODCs) including, but not limited to, FREON (R-12 and R-22) – needed to purchase, sell or handle |
Stratospheric Ozone Protection Operating Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Perchloroethylene Dry Cleaners - air permit required for the operation of these facilities |
FAQs | |
| Private Sanitary Sewer Operating (PSO) permit (new PSO or modification of existing permit) |
Private Sanitary Sewer Operating Permit Application |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Sanitary Sewer System (privately owned or operated) |
Private Sanitary Sewer Operating Permit Application |
FAQs |
| Sewage treatment plants (commercial greater than 5,000 gallons per day/residential greater than 10,000 gallons per day & a public sewer system is neither operable nor available within ¼ mile of operation) – construction | FDEP Wastewater Facility or Activity Permit Application - General Information ![]() FDEP Wastewater Permit Application Form 2A for Domestic Wastewater Facilities ![]() |
FAQs |
|
Solid Waste:
|
Solid Waste Permit Application ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Water treatment plants – construction for community systems |
Potable Water Supply Operating Permit Application |
FAQs |
| Wellfield protection areas not served by sanitary sewers – Construction within this area | IW6 Permit Application ![]() |
FAQs |
Other Forms & Affidavits
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Asbestos-containing materials – needed before all demolition projects & any renovation where asbestos might be disturbed |
Notice of Demolition or Asbestos Renovation |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Demolition or renovation projects where Asbestos material(s) might be present or disturbed |
Notice of Demolition or Asbestos Renovation |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Elevation new structures and substantially improved or damaged structures (elevation certificate) to show your structure is built in compliance with the National Flood Insurance Program (NFIP) – mandatory for all |
FAQs (uninc.) FAQs (muni.) |
|
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Certificate of completion for construction or modification of industrial waste pretreatment facilities |
Industrial Pretreatment Facility Certificate of Completion of Construction ![]() |
FAQs |
| Slug control plan for new or existing industrial waste pretreatment facilities | Industrial Pretreatment Facility Spill/Slug Discharge Control Plan ![]() |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Renovation or demolition projects where Asbestos material(s) might be present or disturbed |
Notice of Demolition or Asbestos Renovation |
FAQs |
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Storage tank – abandonment of a storage tank: aboveground or underground |
Storage Tank Abandonment Application ![]() |
FAQs |
| Storage tank – removal of a storage tank: aboveground or underground | Storage Tank Removal Application ![]() |
FAQs |
Plan Review
|
This permit is needed for:
|
Permit Application |
FAQs |
|
Sewer system able to handle the additional flow – all applicants need this before building permit is issued |
FAQs | |
|
Storage tank – removal of a storage tank: aboveground or underground |
Storage Tank Removal Application ![]() |
FAQs |
You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.
Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.

Home



